MEMORANDUM — RESEARCH FINDINGS (NOT LEGAL ADVICE)
Date: November 27, 2026
Re: September 2021 clear-cutting of ~10 acres of mature forest at the Quarry Walk site, Yorklyn/Hockessin, Delaware (developer: Quarry Walk LLC — Drake McNish Cattermole and David H.C. Carpenter; builder: Ryan Homes; land administered by DNREC under the Auburn Valley Master Plan)
Prepared for: The Quarry Walk File (public-records / PI-style report)
Sources: public web only; no PACER, no county-recorder pull, no contact with any person or agency. All URLs below were live as of Nov. 27, 2026.
Confidence key: HIGH = multiple independent sources/primary documents; MEDIUM = single credible source or secondary characterization; LOW = inferred/unverified.

=====================================================================
1. WHAT THE PUBLIC RECORD DOCUMENTS ABOUT THE CLEAR-CUT
=====================================================================

Date and extent
- Early September 2021: residents "woke up one day" to find ~10 acres of nearly century-old forest along Yorklyn Road at the intersection with Hockessin Hills Rd / Old Wilmington Road removed. ~10 acres = 430,560 sq ft. (HIGH)
  Sources: Delaware Online, Aug. 21, 2024, "Yorklyn 'land grab'? Why Delaware's environmental agency cut deals for luxury housing," https://eu.delawareonline.com/story/money/real-estate/2024/08/21/yorklyn-delawares-parks-agency-housing-business/74337230007 ; Greenville & Hockessin Life / Chester County Press, June 26, 2024, "Scorched earth near Yorklyn," https://www.chestercounty.com/2024/06/26/496225/greenville-hockessin-life-scorched-earth-near-yorklyn ; Spotlight Delaware, Apr. 20, 2026, https://spotlightdelaware.org/2026/04/20/yorklyn-residents-consider-lawsuit-to-stop-townhome-construction/ (republished at https://www.newsfromthestates.com/article/yorklyn-residents-consider-lawsuit-stop-townhome-construction)
- Sandra Finsel (resident): became involved Sept. 2021 when "construction workers cleared 10 acres of forest without community notice to make way for Quarry Walk." (HIGH) — Spotlight Delaware, Apr. 20, 2026 (URL above).
- DNREC public hearing transcript (Docket 2024-P-W-0010, June 25, 2024, reported by Veritext; PDF hosted by DNREC): Carlos Alejandro and Maggie Mesinger both describe the razing of 10 acres in Sept. 2021 as the community's "first sign" of the project; a special DNREC meeting at the Creative Center for the Arts (Yorklyn) followed in Sept. 2021. Mesinger: "only after ten acres were cut down, and DNREC was faced with an outraged community, was there a public meeting." (HIGH) — https://documents.dnrec.delaware.gov/Admin/Hearings/2024-P-W-0010/Public-Hearing-Transcript-Quarry-Walk-20240725.pdf
- Greenville & Hockessin Life (Nov. 24, 2021): DNREC presented an AVMP update in Sept. 2021; the Quarry Walk site was "clear-cut for 62 townhomes"; Matt Ritter (DNREC planning administrator) said landscaping would eventually make it blend in. (HIGH) — https://www.ghlifemagazine.com/2021/11/24/375936/the-transformation-of-yorklyn
- Public meeting where residents were finally apprised: Sept. 17, 2021. (MEDIUM-HIGH; reported by Chester County Press) — https://www.chestercounty.com/2024/06/26/496225/greenville-hockessin-life-scorched-earth-near-yorklyn

Actor
- Clearing was done by/for Quarry Walk LLC (Drake McNish Cattermole; Carpenter is the other principal per yorklyncommunity.org and Spotlight Delaware), on land Quarry Walk LLC had acquired (Delaware Online: county transfer-tax records indicate the 20-acre site sold in 2016 for just under ~$600,000; Shawn Tucker identified as Cattermole's lawyer). Builder of record for the townhomes: Ryan Homes (per Ryan Homes sales page, model home at 109 Abner Rd, Hockessin 19707; Ryan Homes in DNREC-hosted Quarry Walk plan set). (HIGH for Quarry Walk LLC/Ryan Homes; MEDIUM for 2016 purchase price — single source, Delaware Online citing county deeds)
  Sources: Delaware Online (above); https://www.ryanhomes.com/new-homes/communities/10222120152633/delaware/hockessin/quarry-walk ; https://documents.dnrec.delaware.gov/parks/planning/auburn-valley/2021-master-plan/construction/Quarry-Walk.pdf ; https://www.yorklyncommunity.org/development

Permits claimed / approvals
- DNREC treats Quarry Walk as inside the Auburn Valley Master Plan (AVMP), which DNREC administers in lieu of New Castle County. DNREC FAQ: Quarry Walk "must obtain DelDOT entrance permits, DNREC sediment and stormwater permits, county sewer approval, DNREC brownfield regulation approval, and State Fire Marshal approval," but NOT county land-use approval and NOT PLUS review. (HIGH) — https://documents.dnrec.delaware.gov/parks/planning/auburn-valley/auburn-valley-plan-update-faq.pdf
- DNREC's position (per Chester County Press and DNREC FAQ): the property was added to the AVMP because it is a certified brownfield (arsenic, thallium), and developer participation was needed to remediate it; DNREC claims legal notices were placed in The News Journal, and that Quarry Walk was presented as a concept at an April 2016 AVMP update session. Residents who attended dispute recalling Quarry Walk being presented; they say the parcel was never on AVMP maps and was added in 2016 without notice. (HIGH that DNREC made these claims; MEDIUM on the underlying notice adequacy)
- DNREC on-record admission: "DNREC should have done a better job communicating the specifics of the residential portions of the plan now coming online… DNREC had a responsibility to communicate directly with the public on the specifics of the residential portions of the redevelopment, and we should have done so." (HIGH — quoted verbatim in Chester County Press, attributed to a DNREC website statement) — https://www.chestercounty.com/2024/06/26/496225/greenville-hockessin-life-scorched-earth-near-yorklyn
- DNREC record plan for Quarry Walk (subdivision into 64 lots: 61 residential townhome lots, 2 state open-space lots, 1 NCC sewer pump-station lot; "THE SITE IS CURRENTLY UNDEVELOPED"; Drake Cattermole certification; DNREC Director of Parks and Recreation / Director of Waste & Hazardous Substances / Chief of Planning signature blocks). The plan set contains Ryan Homes marketing material dated 9/9/21 and a display-print quote dated 9/9/21. (HIGH) — https://documents.dnrec.delaware.gov/parks/planning/auburn-valley/2021-master-plan/construction/Quarry-Walk.pdf
- Timing anomaly: the record plan set is dated Sept. 2021 — the same month as the clear-cut — and DNREC's first apprising of the public came AFTER the trees were down (Sept. 17, 2021 meeting; special meeting at the Creative Center for the Arts). Whether a DNREC-approved sediment & stormwater plan and a Construction General Permit NOI were in place BEFORE the clearing began is NOT established by any public document located; this is a central gap (see §6 FOIA list). (HIGH that the gap exists)
- Underlying authority: Quarry Walk was NOT part of the original 2011 AVMP. Delaware Online: "the state later exercised this broad authority to add two multi-acre properties to the plan in 2016, both owned by Cattermole. One was Mill's Edge… The other was Quarry Walk." (HIGH) — Delaware Online (above).

Public notice / lack thereof
- No community notice preceded the clear-cut; residents describe having had no idea until the trees were gone. (HIGH — consistent across Delaware Online, Spotlight Delaware, Chester County Press, GH Life, DNREC transcript, yorklyncommunity.org)
- DNREC's claimed notice = News Journal legal ads + an April 2016 AVMP "concept" presentation. Residents: insufficient, and not specific to this parcel. (HIGH that these are the competing accounts)
- 2021 AVMP update posters (DNREC) and the 2021 update added a smaller parcel again "with no notice" per yorklyncommunity.org — advocacy source, unverified independently. (LOW-MEDIUM) — https://www.yorklyncommunity.org/development ; https://documents.dnrec.delaware.gov/parks/planning/auburn-valley/auburn-valley-plan-update-posters.pdf

Site identifiers
- Tax parcels: 08-008.10-117 through -120 and 08-008.10-083 through -103 (per resident counsel's hearing-request letter, Mar. 5, 2024, and DNREC public notice WR20240059). These fall within parcel range 08-008.10-068 through -137 listed in recent bond-bill AVMP language. Addresses used inconsistently across documents: 838 Yorklyn Rd (DNREC hearing notice, transcript, draft permit WPCC 3023/24), 383 Yorklyn Rd (Secretary's Order 2024-W-0052), 810 Yorklyn Rd (DNREC public notice), ~"1,200 ft north of Old Wilmington Road." Area ≈ 20 acres (Delaware Online, transfer-tax reporting). (HIGH on parcel numbers; MEDIUM on ~20 ac acreage)
  Sources: https://documents.dnrec.delaware.gov/Admin/Hearings/2024-P-W-0010/exhibits/hearing-requests-and-comments.pdf ; https://dnrec.delaware.gov/public-notices/wr20240059/ ; https://dnrec.delaware.gov/public-notices/wr20240213/ ; https://documents.dnrec.delaware.gov/Admin/Orders/Secretarys-Order-No-2024-W-0052.pdf ; https://documents.dnrec.delaware.gov/Admin/Hearings/2024-P-W-0010/exhibits/draft-quarry-walk-wastewater-collection-and-conveyance-system-permit.pdf

=====================================================================
2. LEGAL / REGULATORY FRAMEWORKS PLAUSIBLY APPLICABLE
=====================================================================

A. Auburn Valley Master Plan exemption statutes (the controlling-framework question)
- FY2011 Bond and Capital Improvements Act (145th Gen. Assembly), House Bill 500, signed July 1, 2010 ("act of the General Assembly in 2010" cited by Chester County Press), § 85 "Auburn Valley Project": implementation of the transportation, stormwater management, demolition, remediation, redevelopment, and parks/recreation elements of the AVMP "shall not be subject to the zoning, subdivision, land use, or building code ordinances or regulations of New Castle County," with no parcel list. (HIGH)
  https://legis.delaware.gov/BillDetail?LegislationId=19560 ; PDF: https://legis.delaware.gov/json/BillDetail/GetPdfDocument?fileAttachmentId=38556 (145th GA HB 500, § 85)
- Same language repeated in later bond bills (e.g., FY2017 HB 450, 149th GA, § 84 "Auburn Valley Project," 81 Del. Laws ch. 299 — https://legis.delaware.gov/SessionLaws/Chapter?id=15823 ; session-law PDF, fileAttachmentId=353525: "Section 84. Auburn Valley Project…").
- FY2026 Bond and Capital Improvements Act (SB 200, 153rd GA, June 25, 2025), 85 Del. Laws ch. 64, § 89 — adds parcel lists (state park parcels + listed private parcels "if there is an approved redevelopment agreement with DNREC," incl. 08-008.10-068 through -137) and requires DNREC to develop a county-transition plan/timeline and report to the Joint Committee on Capital Improvement by April 1, 2026; authority over those private parcels terminates on issuance of all Certificates of Occupancy for an individual townhouse building or Dec. 30, 2030, whichever first; if no redevelopment agreement is finalized, authority returns to New Castle County July 1, 2027. (HIGH) https://legis.delaware.gov/SessionLaws/Chapter/GetPdfDocument?fileAttachmentId=650668
- FY2027 Bond and Capital Improvements Act (HB 500, 153rd GA, June 25, 2026), 85 Del. Laws ch. 341, § 88 — same parcel-list/sunset structure. (HIGH) https://legis.delaware.gov/SessionLaws/Chapter/GetPdfDocument?fileAttachmentId=657847
- Quarry Walk's parcels (08-008.10-083…103, -117…-120) sit inside the 08-008.10-068–137 range; the exemption therefore persists for Quarry Walk until COs issue or Dec. 30, 2030. (MEDIUM-HIGH — parcel-range match verified; CO status not verified)
- Effect: county zoning/subdivision/land-use/building-code ordinances do NOT apply to AVMP elements; DNREC is the approving authority; PLUS not formally required (DNREC FAQ). County tree-protection/clearing provisions therefore likely unavailable against this project — but the exemption text reaches "zoning, subdivision, land use, or building code ordinances or regulations" — it does NOT on its face waive state environmental law (sediment/stormwater, ch. 40; ch. 60 enforcement) or federal law. (MEDIUM-HIGH — text reading; counsel should confirm scope)
- County vs. state authority dispute: county officials told Delaware Online the county "had limited ability to contest such state actions except perhaps in court — an option the county did not pursue." DNREC and NCC have since agreed to transition land-use control back to the county, but the three approved plans (Quarry Walk, Mill 6, Mill's Edge) remain under DNREC control until constructed. (HIGH) — Delaware Online; Spotlight Delaware Apr. 20, 2026 (URLs above)

B. Delaware Erosion and Sedimentation Control law, 7 Del.C. ch. 40 + DNREC enforcement
- Chapter 40 requires that, after July 1, 1991, no person may engage in land-disturbing activity (expressly including "clearing, grading, excavating, transporting, and filling of land") without submitting a sediment and stormwater management plan to the appropriate plan-approval authority and obtaining a permit to proceed; the developer must certify clearing will follow the approved plan; state/federal agencies likewise may not clear land without an approved plan. (HIGH) — https://delcode.delaware.gov/title7/c040/
- Enforcement tools in ch. 40 (per Delaware Code Online text and DNREC guidance): construction-review notifications; plan-inadequacy notices; cease-and-desist orders (stop all site work except compliance actions); DNREC may ask the plan-approval agency to withhold further building/grading permits; referral for enforcement; civil/administrative penalties under chs. 40 and 60. (HIGH) — https://delcode.delaware.gov/title7/c040/ ; DNREC enforcement/CGP materials: https://dnrec.delaware.gov/watershed-stewardship/sediment-stormwater/ ; https://regulations.delaware.gov/register/may2016/emergency/Article4.pdf
- DNREC Sediment and Stormwater Program created by 7 Del.C. ch. 40 (1978); 7 DE Admin. Code 5101 (Sediment and Stormwater Regulations). Responsible on-site personnel for clearing must hold "Blue Card" Contractor Training certification. (HIGH) — https://dnrec.delaware.gov/watershed-stewardship/sediment-stormwater/
- Key open question: was a ch. 40 sediment/stormwater plan approved and a CGP NOI filed before the Sept. 2021 clearing? No public document located confirms either; DNREC FAQ lists sediment/stormwater permits as required. (HIGH that it's open)

C. NPDES Construction General Permit (CGP) / federal stormwater
- Delaware's NPDES CGP covers construction disturbing ≥ 1 acre, including clearing/grading; requires NOI, SWPPP-equivalent controls, inspections, and responsible-personnel certification; failure to comply = violation subject to enforcement under 7 Del.C. chs. 40 and 60 ("halt construction activity until violations… are corrected" is an express CGP enforcement tool). (HIGH) — https://documents.dnrec.delaware.gov/Watershed/Sediment-Stormwater/Permits/Construction-General-Permit.pdf ; fact sheet: https://documents.dnrec.delaware.gov/Watershed/Sediment-Stormwater/Permits/Construction-General-Permit-Fact-Sheet.pdf
- Note: Delaware administers NPDES by delegation; the CGP is a state-issued federal permit. Whether an NOI was filed for Quarry Walk pre-clearing is verifiable via DNREC DEN permit search (returned 250-result cap for 2021 "Land Development Erosion Control" — not name-searchable online; FOIA needed) or FOIA. (HIGH)

D. Federal Clean Water Act § 404 / wetlands
- No evidence found of a § 404 permit or a DNREC Wetlands permit for the clear-cut. The site contains a former quarry pond and low/wet areas along Red Clay Creek tributaries; AVMP remediation created wetlands nearby. If any waters/wetlands were filled without a § 404 permit (or state wetlands permit under 7 Del.C. ch. 66 — chapter number not independently verified here), federal (USACE/EPA) and state enforcement exposure would exist. (LOW-MEDIUM — speculative absent site data)
- Related: Section 401 WQC is DNREC's; no 401 for this project was located. (MEDIUM)

E. New Castle County Unified Development Code tree/forest provisions (applicable only if AVMP exemption fails or for non-AVMP work)
- NCC UDC § 40.10.135 (Forests): mature CNA/all-other-district mitigation ratios up to 2.75:1; tree survey by landscape architect/arborist/forester required; highest-value stands prioritized for preservation. § 40.10.230 (Clearing): clearing permitted only to prepare land for a permitted use or as reforestation/hazard removal, and a clearcutting operation must conform to a forest management plan approved by the Department (NCC) after review by Del. Dept. of Agriculture Division of Forest Services. § 40.23.300 (Tree protection): specimen trees identified on plan; replacement where preservation infeasible. § 40.05.420 area limits for forest clearing absent mitigation. Chapter 40 Art. 33 defines "Clearcutting" (wholesale removal of all trees) and counts >20% forest removal for non-forestry purposes as a use change. UDC Amendment 21-009 (2021) added Forest Habitat Value Assessment requirements. (HIGH that these provisions exist; MEDIUM on current recodification numbering — UDC is periodically renumbered; 2019 compilation cited)
  https://www.newcastlede.gov/DocumentCenter/View/31394/Unified-Development-Code-Updated-through-May-29-2019 ; https://www.newcastlede.gov/DocumentCenter/View/26279/18-021sub1 ; https://www.newcastlede.gov/DocumentCenter/View/41219/21-009
- Critical point: these would have REQUIRED plan approval, tree survey, mitigation for ~10 ac of mature forest (mitigation ratio ≥1.75:1–2.75:1). AVMP exemption (see A) likely displaces them for this project. Residents' argument (Chester County Press): "If the county had been involved… the UDC would have required developers to work around old growth, habitat, and riparian buffers." (HIGH as resident position; applicability contested)
- Also note: NCC UDC Cockeysville Water Resource Protection Area (source-water protection, implements Delaware source-water law) — residents argue Quarry Walk sits in the recharge area and must comply with WRPA provisions "in accordance with Delaware law regarding Source Water Protection"; DNREC commissioned its own aquifer study concluding a "small water deficit," disputed by residents (claims millions of gallons). No county enforcement found (county lacks jurisdiction under AVMP). (MEDIUM) — https://www.yorklyncommunity.org/news/wrpa ; Spotlight Delaware (URLs above)

F. State/county forest or tree ordinances
- Delaware has no general state tree/forest protection statute prohibiting clearing of private mature woodland per se; protection runs through sediment/stormwater (ch. 40), wetlands, and local codes. NCC UDC (above) is the operative local regime. No Yorklyn-specific ordinance exists. (MEDIUM-HIGH)

G. AVMP agreements and brownfield conditions (contract-based theories)
- December 2020: Cattermole/Carpenter signed a single development contract with DNREC covering Quarry Walk, Mill 6, and Mill's Edge (advocacy source; corroborated in substance by Delaware Online's "approvals… negotiated directly with the state"). The contract reportedly includes a "Pump and Haul for Model Homes" clause (§ 2.4.8) stating that under no circumstances does pump-and-haul authorization apply to Quarry Walk — invoked by residents to argue DNREC processed an impermissible holding-tank permit. (MEDIUM — contract text quoted on advocacy site; the contract itself is not public in the located record) — https://www.yorklyncommunity.org/development
- Cattermole "ceded more than 10 acres of Quarry Walk to public use, including a right of way for bicycling and a would-be fishing pond at the former quarry," and took on remediation of arsenic contamination (digging out the historic kiln and chimney per DNREC engineer Cargill). (HIGH) — Delaware Online
- Certified brownfield status: DNREC cites arsenic/thallium; residential-standard cleanup expected by GHADA (business group supportive of project) and DNREC. (HIGH that this is DNREC's stated rationale) — Chester County Press; hearing transcript (GHADA comment)
- Condition theories: if the redevelopment agreement conditions approval on remediation, public-use dedication, or phasing, and clearing/remediation proceeded out of sequence or without the required plans, residents could argue breach of agreement conditions / APA (Delaware Administrative Procedures Act, Title 29 ch. 101) challenge to DNREC's approvals. No such challenge located. (LOW-MEDIUM)

H. Civil theories floated by residents (April 2026 meeting)
- Nuisance (private/public), trespass (unlikely against landowner of record — clearing was on the developer's own parcel; trespass would need encroachment/off-site sediment), injunctive relief to stop construction; or purchase of the land. Standing and the clean-hands/laches posture (5 years post-clear-cut) are significant obstacles; Spotlight Delaware reports no decisions made and neither developer responded to comment requests; DNREC Secretary Patterson: the three projects "have the legal right to proceed." (HIGH that these are the floated theories; LOW on viability — counsel question) — Spotlight Delaware, Apr. 20, 2026

I. Administrative-procedure avenues
- DNREC permit actions are appealable under Delaware APA (29 Del.C. ch. 101) to the Environmental Appeals Board (within short statutory windows, typically ~20 days from notice/Order — exact deadline counsel must confirm). Secretary's Order 2024-W-0052 (Dec. 15, 2024) approving the WPCC 3023/24 construction permit; the temporary holding-tank application was withdrawn by the applicant Oct. 8, 2024. (HIGH) — https://documents.dnrec.delaware.gov/Admin/Orders/Secretarys-Order-No-2024-W-0052.pdf ; permit: https://documents.dnrec.delaware.gov/Admin/Hearings/2024-P-W-0010/Wastewater-Construction-Permit-No-WPCC-3023-24.pdf
- Note: the Sept. 2021 clearing itself was not a "permit action" with a notice/appeal clock; any APA challenge to the underlying DNREC approval of the AVMP amendment/record plan would have had its own (likely long-expired) windows. (MEDIUM)

J. Federal constitutional/takings or § 1983 theories (flag only)
- Not raised publicly; the state action (DNREC approval) could theoretically support federal-question framing, but no such filing located and viability is doubtful given the bond-bill exemptions. Flag for counsel only. (LOW)

=====================================================================
3. ENFORCEMENT HISTORY / LITIGATION — WHAT WAS FOUND
=====================================================================

FOUND — NONE for the clear-cut specifically:
- DNREC Delaware Environmental Navigator violation search (run Nov. 27, 2026): "Quarry Walk," "Cattermole," "CCS Investors" → 0 violation results, 0 enforcement results. (HIGH — direct query of den.dnrec.delaware.gov; search covers DEN-recorded violations/enforcement only)
  https://den.dnrec.delaware.gov/Search/ViolationSearch.aspx ; https://den.dnrec.delaware.gov/Search/EnforcementSearch.aspx
- No Secretary's Order, cease-and-desist, notice of violation, penalty, or stop-work order relating to the Sept. 2021 clearing appears in DNREC's published Secretary's Orders (permitting or enforcement pages) or in the 2024-P-W-0010 hearing record. (HIGH) — https://dnrec.delaware.gov/secretarys-orders/permitting/ ; https://dnrec.delaware.gov/secretarys-orders/enforcement/
- CourtListener (web): only an unrelated Connecticut insurance case (Residences at Quarry Walk, LLC v. New York Marine and General Insurance Co., 3:22-cv-871, D. Conn.). CourtListener's live search UI and v4 API returned 403/"Authentication credentials were not provided" from this environment; Delaware CourtConnect (courts.delaware.gov) was not queried (interactive search). Web searches of Delaware courts for "Quarry Walk," "Mill's Edge," "Mill 6," Cattermole, Carpenter returned no Delaware litigation. No injunction, nuisance suit, or APA appeal filed by residents or NCC located as of this date. (MEDIUM-HIGH — absence of evidence; recommend CourtConnect pull for completeness)
- New Castle County did not sue or pursue court action (Delaware Online: county "limited ability… except perhaps in court — an option the county did not pursue"). (HIGH)
- No EPA/USACE § 404 action located. (MEDIUM)
- No litigation reported in any news source through Apr.–Nov. 2026; April 2026 article says residents are only then "considering" suit. (HIGH)

FOUND — adjacent administrative record (not enforcement):
- DNREC Docket 2024-P-W-0010 (June 25, 2024 public hearing; >60 recorded objectors; 100-plus-signature petition; comment period closed July 10, 2024) → Secretary's Order 2024-W-0052 (Dec. 15, 2024) approving Wastewater Construction Permit WPCC 3023/24 (issued Dec. 16, 2024) under 7 Del.C. §§ 6003, 6004, 6006; temporary holding-tank application withdrawn by applicant Oct. 8, 2024. Hearing Officer report Dec. 11, 2024; TRM Dec. 2, 2024. Permit WPCC 3051/19 (issued Aug. 29, 2022) referenced as pre-existing partial sewer infrastructure. (HIGH) — URLs in §1/§2.I above.
- GHADA (business group) spoke FOR the project at the hearing; claims most cleared trees were invasive/diseased (ash borer, spotted lanternfly) and site remediation to residential standard required cleanup. (HIGH as to the statement; unverified scientifically) — transcript, pp. 32–33
- DNREC denied the proposed six-story Chatham Bay apartment at Mill One (Dec. 2024 proposal) after community opposition — shows DNREC is responsive on other parcels, not on the completed clear-cut. (MEDIUM) — https://www.yorklyncommunity.org/development
- DNREC purchased ~30 acres for $6M to add to Auburn Valley State Park (reported 2025–2026). (MEDIUM) — Spotlight Delaware (above)
- Environmental Navigator 2021 "Land Development Erosion Control" permit query returned 250+ results (cap), not name-filterable online — cannot confirm/deny a Quarry Walk 2021 sediment permit from the web UI alone. (HIGH)

=====================================================================
4. PROCEDURAL DEADLINES & WHO ENFORCES WHAT (general notes — counsel to confirm)
=====================================================================
- 7 Del.C. ch. 40 (erosion/sediment): enforced by DNREC + plan-approval authority (here DNREC under AVMP, or conservation districts); cease-and-desist power; administrative penalties via ch. 60 (§ 6005 authorizes Secretary to assess administrative penalties, as used on DNREC's enforcement-orders page); no short limitations bar found in ch. 40 text located — but equitable/laches arguments against 5-year-old conduct are real. (MEDIUM)
- 7 Del.C. ch. 60 (Environmental Control; Natural Resources & Environmental Control): DNREC Secretary; permits/enforcement; appeal to Environmental Appeals Board (29 Del.C. ch. 101 APA) — strict windows (commonly ~20 days from order/notice; confirm). (MEDIUM)
- NPDES CGP: DNREC (delegated federal program); citizen-suit provision exists in CWA § 505 (60-day notice) for ongoing violations — a one-time 2021 clearing with no ongoing discharge likely does not support a citizen suit absent continuing noncompliance. (MEDIUM)
- CWA § 404 (if wetlands filled): USACE/EPA enforcement; citizen suits possible for unpermitted discharges (no SOL for non-reporting violations in some readings — counsel). (LOW-MEDIUM)
- NCC UDC: county — likely displaced by AVMP exemption; county declined to litigate. (HIGH)
- Delaware APA declaratory-judgment/§ 7061-style review of DNREC action: windows long closed for Sept. 2021 events; prospective review of WPCC 3023/24 closed upon Order 2024-W-0052 (Dec. 2024) + appeal window. (MEDIUM)
- Civil: 3-year personal/property-damage SOL (10 Del.C. § 8106 — general Delaware rule) likely bars damage claims from Sept. 2021 clearing filed after Sept. 2024 absent tolling; continuing-nuisance and injunctive framing may differ; Chancery injunction has no strict SOL but laches applies. (LOW-MEDIUM — general; counsel must analyze)
- Bond-bill AVMP authority: private-parcel authority terminates Dec. 30, 2030 (or on issuance of all COs); failure to finalize a redevelopment agreement → county jurisdiction resumes July 1, 2027; April 1, 2026 transition report deadline to Joint Committee on Capital Improvements. These are review/oversight hooks, not causes of action. (HIGH — statutory text)
- Who does what (summary): DNREC — land use/subdivision/plan approval, sediment/stormwater, 401 WQC, brownfield, wastewater, enforcement/cease-and-desist; NCC — displaced for AVMP parcels; USACE/EPA — § 404 (if triggered); Del. Dept. of Agriculture Div. of Forest Services — consults on forest management plans under UDC (displaced); Delaware courts (Super. Ct. / Chancery) — civil, injunctions; Environmental Appeals Board + Chancery — administrative review; Joint Committee on Capital Improvements — legislative oversight of AVMP transition.

=====================================================================
5. BOTTOM LINE
=====================================================================
The documented record shows: (i) a ~10-acre clear-cut in early September 2021 by the developer's forces on a ~20-acre parcel later revealed as the Quarry Walk townhome site; (ii) zero advance community notice; residents learned of the project only after the trees were gone, first apprised Sept. 17, 2021 / at a special DNREC arts-center meeting; DNREC concedes it "should have done a better job communicating"; (iii) DNREC claims notice via News Journal ads and an April 2016 concept presentation; the parcel was added to the AVMP in 2016 without an AVMP map depiction residents recognize, under 2010 bond-bill language exempting AVMP elements from NCC zoning/subdivision/land-use/building-code regulation; (iv) no enforcement action, violation notice, stop-work order, penalty, APA appeal, or lawsuit over the clear-cut has been located anywhere — DNREC's Environmental Navigator returns zero violations/enforcement for Quarry Walk/Cattermole/CCS Investors; (v) the only contested public process to date was the 2024 wastewater hearing (Docket 2024-P-W-0010), which ended in approval (Order 2024-W-0052) with the holding-tank application withdrawn; (vi) residents are as of April 2026 "considering" suit; nothing filed located.

The legal vulnerability of the clear-cut itself is real but narrow: the strongest hooks are (a) whether a ch. 40 sediment/stormwater plan and CGP NOI were approved/filed BEFORE clearing (if not, a per se ch. 40/CGP violation — though DNREC is both regulator and plan approver here and has not acted), (b) whether any wetlands/waters were disturbed without § 404, (c) the legitimacy of the 2016 no-notice AVMP insertion (ultra vires / APA — but likely time-barred), and (d) contract-condition theories under the Dec. 2020 DNREC–developer agreements (unpublished). The AVMP exemption statutes (2010, re-enacted 2017–2027 with parcel lists and a Dec. 30, 2030 sunset) are the elephant: they likely immunize the subdivision/land-use approval itself from county law, but on their face do not waive state environmental-enforcement or federal law.

=====================================================================
6. FOIA / RECORDS REQUESTS THAT WOULD CLOSE THE GAPS
=====================================================================
Delaware FOIA (29 Del.C. ch. 100) to DNREC (and NCC, USACE, Del. DDA, Recorder of Deeds) asking for:

DNREC — Division of Parks and Recreation / AVMP:
1. The complete redevelopment agreement(s) between DNREC and Quarry Walk LLC / CCS Investors / Cattermole / Carpenter (Dec. 2020 and any amendments), including § 2.4.8 ("Pump and Haul for Model Homes") and all conditions on the Quarry Walk parcel (08-008.10-083 to -103, -117 to -120).
2. The 2016 AVMP amendment record adding the Quarry Walk and Mill's Edge parcels: internal memoranda, approvals, authority cited, any public notice, and the certified brownfield documentation (arsenic/thallium sampling reports) for the parcel.
3. The Sept. 2021 record plan and all DNREC approval signatures/dates (Director of Parks & Rec.; Director of Waste & Hazardous Substances; Chief of Planning) and the file for the "record plan" approval process.
4. All communications (emails, letters, texts, meeting notes) between DNREC staff (Ritter, Cargill, Bivens, Vest, Secretary's office) and Quarry Walk LLC / Apex Engineering / Ryan Homes / CCS Investors from Jan. 2021 through Oct. 2021 concerning clearing, grading, or tree removal.
5. The sediment & stormwater management plan for the Quarry Walk parcel and its approval date; the Construction General Permit NOI/authorization number and filing date; any pre-clearing inspection reports; the "Blue Card" certifications of responsible personnel for the clearing contractor; any construction review notes Aug.–Nov. 2021.
6. Any pre-clearing notices, stop-work communications, cure notices, or informal warnings issued to Quarry Walk LLC or its contractors about the September 2021 clearing, whether or not resulting in a formal violation.
7. The DNREC "should have done a better job communicating" statement's underlying memo and any internal after-action review of the Sept. 2021 clearing.
8. The traffic impact study, aquifer/Cockeysville WRPA study, and arsenic/kiln remediation plan and completion documentation referenced in Order 2024-W-0052's record and the FAQ.
9. 2021 AVMP update public-notice file (dates, publications, attendee lists for the April 2016 and Sept. 2021 meetings, sign-in sheets, minutes).

DNREC — Division of Water / Hearings:
10. Full 2024-P-W-0010 record (all 60+ comments, TRM appendices, and the withdrawn holding-tank application file) — most is posted; confirm completeness.
11. Any CGP enforcement file, inspection, or Notice of Intent for WPCC 3051/19 and WPCC 3023/24 sites, 2021–2026.

New Castle County:
12. Any complaints received by NCC Land Use, Code Enforcement, or Police/Fire re: the Sept. 2021 clearing (911/311 logs, code-enforcement tickets, zoning referrals).
13. NCC Law Department opinions on the AVMP exemption and any correspondence with DNREC re: contesting it (Delaware Online says county considered court action).
14. NCC Dept. of Public Works sewer capacity/connection agreements and any conditions tied to AVMP approvals.

Other:
15. Recorder of Deeds (NCC): 2016 purchase deed for the ~20-acre Quarry Walk parcel (price, grantor, grantees incl. Quarry Walk LLC/CCS Investors) and the recorded open-space/bike-ROW dedication and quarry fishing-pond easement to the state.
16. USACE Baltimore District / Philadelphia District: jurisdictional determination or § 404 application for the Quarry Walk site (quarry pond / Red Clay Creek tributaries), 2016–2026.
17. Del. Dept. of Agriculture, Division of Forest Services: any consultation on a forest management plan for the parcel (required under UDC framework; likely none — absence is itself probative).
18. Delaware CourtConnect (courts.delaware.gov) civil search: "Quarry Walk," "Mill 6 Redevelopment," "Mills Edge," "CCS Investors," "Cattermole," "Carpenter" — New Castle County Superior Court, Court of Chancery, Court of Common Pleas, 2020–present (liens, mechanic's liens, injunctions, APA appeals).
19. NCC parcel history for 08-008.10-083 to -103/-117 to -120 (2021 permits/EOF filings, transfer tax, stormwater plans recorded).
20. DelDOT: entrance-permit application/approval for Quarry Walk and any TIS waiver correspondence (FAQ claims <500 vehicles/day, <50 vehicles/hour — verify count methodology).

=====================================================================
7. OPEN QUESTIONS FOR COUNSEL
=====================================================================
- Does "shall not be subject to the zoning, subdivision, land use, or building code ordinances or regulations of New Castle County" (2010 § 85; re-enacted) reach NCC's UDC *tree/forest* provisions, or only subdivision/zoning/building codes? (Text reaches "land use … regulations," which likely swallows tree provisions — but a court fight over that construction is the residents' core problem.)
- Was any ch. 40 plan approved before clearing? If yes, was clearing consistent with it (clearing limits, timing, Blue Card)? If no, is DNREC enforcement realistically available five years later (laches; agency discretion; no private right of action under ch. 40 — confirm)?
- Do residents (or yorklyncommunity.org's GHADA-opponents) have standing for public nuisance/injunction given the clear-cut is complete and the harm irreversible? Continuing-nuisance vs. permanent-nuisance SOL on Delaware facts.
- APA: is the Dec. 2020 redevelopment agreement itself reviewable, and are there any live hooks (e.g., the April 1, 2026 transition report; the Dec. 30, 2030 sunset; the partly-built pump station)?
- Bond-bill mechanics: does the parcel-range listing (08-008.10-068 to -137) plus "approved redevelopment agreement" requirement mean the exemption fails if the Dec. 2020 contract is invalid, unenforceable, or was not properly "approved"? This is the cleanest potential lever against the whole AVMP architecture — and it is a contract/records question, hence items 1–3 above.
- Whether DNREC's Sept. 2021 clearing without pre-clearing sediment plan (if confirmed) constitutes a per se violation supporting (i) a citizen petition to DNREC, (ii) a referral to the conservation district, or (iii) mandamus — and whether mandamus lies to compel discretionary enforcement (generally disfavored).
- Ryan Homes' potential exposure as a purchaser/builder with knowledge (knew or should have known of no pre-clearing permit) — negligence/aiding; Ryan Homes is the public-facing seller.
- Federal angle: any waters of the US on site; § 505 citizen-suit notice viability; any § 404 Rapanos nexus.

Limitations of this memo: web-only research; Delaware Online article is paywalled (content corroborated via search excerpts + Spotlight Delaware/newsfromthestates republication and transcript quotes); CourtListener and newcastlede.gov blocked/interactive; DEN enforcement search may under-report (only DEN-recorded actions); advocacy site (yorklyncommunity.org) used only where corroborated or flagged; the December 2020 contract and brownfield data are quoted, not inspected; no interviews or document demands were made. Nothing here is legal advice.